Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs
From MaRDI portal
Publication:3455883
DOI10.1142/S0217595915500396zbMath1330.90027OpenAlexW2247835078MaRDI QIDQ3455883
Byung-Cheon Choi, Myoung-Ju Park
Publication date: 11 December 2015
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595915500396
Minimax problems in mathematical programming (90C47) Linear programming (90C05) Production models (90B30)
Cites Work
- Unnamed Item
- Unnamed Item
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
- An approximation algorithm for interval data minmax regret combinatorial optimization problems
- On the robust shortest path problem.
- Stochastic gradient-based time-cost tradeoffs in PERT networks using simulation
- Robust optimization-methodology and applications
- A Network Flow Computation for Project Cost Curves
- Critical-Path Planning and Scheduling: Mathematical Basis
- The stochastic time–cost tradeoff problem: A robust optimization approach
- Critical path planning under uncertainty
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
- Concurrent Crashing and Overlapping in Product Development
This page was built for publication: Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs