Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Preemptive scheduling in a two-stage supply chain to minimize the makespan - MaRDI portal

Preemptive scheduling in a two-stage supply chain to minimize the makespan

From MaRDI portal
Publication:3458814

DOI10.1080/10556788.2014.969262zbMath1335.90040OpenAlexW1979637415WikidataQ57439534 ScholiaQ57439534MaRDI QIDQ3458814

Wenjuan Fan, Jun Pei, Xin-Bao Liu, Boris I. Goldengorin, Panos M. Pardalos, Shan-Lin Yang

Publication date: 28 December 2015

Published in: Optimization Methods and Software (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/10556788.2014.969262




Related Items (2)



Cites Work


This page was built for publication: Preemptive scheduling in a two-stage supply chain to minimize the makespan