Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

Optimum production and inspection modeling with minimal repair and rework considerations

From MaRDI portal
Publication:346025
Jump to:navigation, search

DOI10.1016/J.APM.2012.04.028zbMath1349.90291OpenAlexW2069087841MaRDI QIDQ346025

Wen-Ying Wang

Publication date: 5 December 2016

Published in: Applied Mathematical Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.apm.2012.04.028


zbMATH Keywords

minimal repairproduction economicspreventive maintenanceimperfect processimperfect reworkoperation strategy


Mathematics Subject Classification ID

Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)


Related Items (2)

Periodic Replacement Policies and Comparisons with Their Extended Policies ⋮ Production lot sizing with quality screening and rework







This page was built for publication: Optimum production and inspection modeling with minimal repair and rework considerations

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:346025&oldid=12220216"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 30 January 2024, at 02:40.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki