Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A Lot-sizing Model for Just-in-time Manufacturing

From MaRDI portal
Publication:3478244
Jump to:navigation, search

DOI10.1057/jors.1990.36zbMath0699.90045OpenAlexW2065264874MaRDI QIDQ3478244

Moshe B. Rosenwein, Hanan Luss

Publication date: 1990

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.1990.36


zbMATH Keywords

lot-sizing heuristicjust-in-time manufacturinglot sizes of multiple itemssingle capacitated facilitytotal holding cost


Mathematics Subject Classification ID

Production models (90B30)


Related Items (3)

Batch-scheduling problems to minimize actual flow times of parts through the shop under JIT environment ⋮ Just-in-Time Planning and Lot-Sizing ⋮ Operations planning for a multi-stage kanban system







This page was built for publication: A Lot-sizing Model for Just-in-time Manufacturing

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3478244&oldid=16814771"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 4 February 2024, at 21:37.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki