Scheduling Parts in a Combined Production-transportation Work Cell
DOI10.1057/jors.1990.86zbMath0703.90047OpenAlexW1992329757MaRDI QIDQ3483069
Publication date: 1990
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1990.86
two-machine flowshopflexible manufacturing systemasymmetric travelling salesmantwo machines in seriesproduction-transportation scheduling problemrobotic transfer devicetwo-machine, automated manufacturing cell
Applications of mathematical programming (90C90) Abstract computational complexity for mathematical programming problems (90C60) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (max. 100)
This page was built for publication: Scheduling Parts in a Combined Production-transportation Work Cell