Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling
From MaRDI portal
Publication:3498906
DOI10.1080/00207540601008374zbMath1141.90422OpenAlexW1985481751MaRDI QIDQ3498906
Christos D. Tarantilis, G. I. Zobolas, George Ioannou
Publication date: 19 May 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540601008374
Related Items (1)
Cites Work
- The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure.
- An efficient genetic algorithm for job shop scheduling with tardiness objectives.
- A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling
- Due date assignment using artificial neural networks under different shop floor control strategies
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Bottleneck-focused scheduling for a hybrid flowshop
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
- Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
- Scheduling in flowshops to minimize total tardiness of jobs
- Rescheduling strategies for minimizing total weighted tardiness in complex job shops
This page was built for publication: Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling