RESCHEDULING WITH RELEASE DATES TO MINIMIZE TOTAL SEQUENCE DISRUPTION UNDER A LIMIT ON THE MAKESPAN
From MaRDI portal
Publication:3502863
DOI10.1142/S021759590700153XzbMath1200.90092OpenAlexW2162062208MaRDI QIDQ3502863
Wenhua Li, Yundong Mu, Jinjiang Yuan, Ling-Fa Lu
Publication date: 20 May 2008
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s021759590700153x
Related Items (7)
Single machine rescheduling for new orders with maximum lateness minimization ⋮ Rescheduling with new orders and general maximum allowable time disruptions ⋮ Predictive-reactive strategy for identical parallel machine rescheduling ⋮ Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs ⋮ Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption ⋮ A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems ⋮ Single-machine rescheduling with deterioration and learning effects against the maximum sequence disruption
Cites Work
This page was built for publication: RESCHEDULING WITH RELEASE DATES TO MINIMIZE TOTAL SEQUENCE DISRUPTION UNDER A LIMIT ON THE MAKESPAN