Single machine scheduling problem with two synergetic agents and piece-rate maintenance
From MaRDI portal
Publication:350484
DOI10.1016/J.APM.2012.04.009zbMath1351.90105OpenAlexW2062473897MaRDI QIDQ350484
Dehua Xu, Yunqiang Yin, Xian-Yu Yu, Yu-Lin Zhang
Publication date: 7 December 2016
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2012.04.009
Related Items (3)
A tabu method for a two-agent single-machine scheduling with deterioration jobs ⋮ A note on two-agent scheduling with resource dependent release times on a single machine ⋮ Single-machine scheduling with piece-rate maintenance and interval constrained position-dependent processing times
Cites Work
- Two-agent single-machine scheduling problems under increasing linear deterioration
- A single-machine scheduling problem with two-agent and deteriorating jobs
- A two-machine flowshop problem with two agents
- Single-machine scheduling with periodic maintenance to minimize makespan
- A note on the scheduling with two families of jobs
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
- Scheduling two agents with controllable processing times
- Scheduling problems with two competing agents to minimize minmax and minsum earliness measures
- Makespan minimization for two parallel machines scheduling with a periodic availability constraint
- Single-machine scheduling with periodic maintenance and nonresumable jobs.
- A Lagrangian approach to single-machine scheduling problems with two competing agents
- A multiple-criterion model for machine scheduling
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
- Competitive Two-Agent Scheduling and Its Applications
- Scheduling Problems with Two Competing Agents
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
This page was built for publication: Single machine scheduling problem with two synergetic agents and piece-rate maintenance