Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Complex Scheduling - MaRDI portal

Complex Scheduling

From MaRDI portal
Publication:3511304

DOI10.1007/3-540-29546-1zbMath1154.90002OpenAlexW4249805289MaRDI QIDQ3511304

Sigrid Knust, Peter Brucker

Publication date: 10 July 2008

Published in: GOR ■ Publications (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/3-540-29546-1




Related Items (33)

The no-wait job shop with regular objective: a method based on optimal job insertionOn the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relationsA flow-based tabu search algorithm for the RCPSP with transfer timesRobust combinatorial optimization with variable cost uncertaintyA Posteriori Analysis of the Algorithms for Two-Bar Charts Packing ProblemMulti-mode resource-constrained project scheduling problems with non-preemptive activity splittingA study on local search neighborhoods for the job shop scheduling problem with total weighted tardiness objectiveA neighborhood for complex job shop scheduling problems with regular objectivesGoing to the core of hard resource-constrained project scheduling instancesAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesImproved load balancing and resource utilization for the skill vehicle routing problemLinear integer programming model as mathematical ware for an optimal flow production planning system at operational scheduling stageCoordinating multi-location production and customer deliverySimultaneous scheduling of replacement and repair of common components in operating systems. A multi-objective mathematical optimization modelA 4/3 OPT+2/3 approximation for big two-bar charts packing problemA memetic algorithm for restoring feasibility in scheduling with limited makespanQuantity-based buffer-constrained two-machine flowshop problem: active and passive prefetch models for multimedia applicationsProduction scheduling with alternative process plansA random key based genetic algorithm for the resource constrained project scheduling problemHandling precedence constraints in scheduling problems by the sequence pair representationIP models for round robin tournamentsScheduling linear deteriorating jobs to minimize the number of tardy jobsA Lagrangian approach for minimum cost single round robin tournamentsPersonnel scheduling: models and complexityThe blocking job shop with rail-bound transportationA resource constrained scheduling problem with multiple independent producers and a single linking constraint: a coal supply chain exampleOn project scheduling problemUnbounded parallel batch scheduling with job delivery to minimize makespanProject selection, scheduling and resource allocation with time dependent returnsA branching scheme for finding cost-minimal round robin tournamentsMetric approach for finding approximate solutions of scheduling problemsApproximability results for the resource-constrained project scheduling problem with a single type of resourcesScheduling interfering job sets on parallel machines






This page was built for publication: Complex Scheduling