Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

Optimum operation control for multiple machining projects under fixed production interval

From MaRDI portal
Publication:3511656
Jump to:navigation, search

DOI10.1080/09720510.2005.10701174zbMath1146.90389OpenAlexW2041789166MaRDI QIDQ3511656

Tian-Syung Lan, Tung-Te Chu, Kuei-Shu Hsu

Publication date: 11 July 2008

Published in: Journal of Statistics and Management Systems (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/09720510.2005.10701174


zbMATH Keywords

calculus of variationsdynamic optimizationdue-date schedulingmaterial removal ratemultiple projects


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30)








This page was built for publication: Optimum operation control for multiple machining projects under fixed production interval

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3511656&oldid=16868987"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 4 February 2024, at 23:16.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki