A genetic algorithm for solving the economic lot scheduling problem in flow shops
From MaRDI portal
Publication:3518466
DOI10.1080/00207540600665893zbMath1153.90424OpenAlexW2049907682MaRDI QIDQ3518466
Publication date: 8 August 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600665893
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Cites Work
- The use of genetic algorithms to solve the economic lot size scheduling problem
- A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes
- The economic lot scheduling problem without capacity constraints
- A combined branch-and bound and genetic algorithm based approach for a flowshop scheduling problem
- Crossing over genetic algorithms: the Sugal generalised GA
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
- Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”
- Note—On the Optimality of Sub-Batch Sizes for a Multi-Stage EPQ Model—A Rejoinder
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Job shop scheduling with a genetic algorithm and machine learning
- Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes
- Sequencing, lot sizing and scheduling of several products in job shops: The common cycle approach
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage Production
- Genetic Algorithms and Random Keys for Sequencing and Optimization
- Using a variable production rate as a response mechanism in the economic production lot size model
- Economic lot scheduling problem with imperfect production processes and setup times
- Hybrid genetic algorithm for the economic lot-scheduling problem
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- Bounds on Multiprocessing Timing Anomalies
- Economic Lot Size Determination in Multi-Stage Assembly Systems
- The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops.
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic
- The economic lot scheduling problem under power-of-two policy
This page was built for publication: A genetic algorithm for solving the economic lot scheduling problem in flow shops