USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES
From MaRDI portal
Publication:3524397
DOI10.1142/S0218488508005340zbMath1142.90520MaRDI QIDQ3524397
Publication date: 9 September 2008
Published in: International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems (Search for Journal in Brave)
Fuzzy and other nonstochastic uncertainty mathematical programming (90C70) Stochastic scheduling theory in operations research (90B36) Dynamic programming (90C39)
Related Items (1)
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Matlab
- Single machine batch scheduling problem with resource dependent setup and processing time in the presence of fuzzy due date
- Ranking fuzzy numbers in the setting of possibility theory
- Two scheduling problems with fuzzy due-dates
- One machine scheduling problem with fuzzy random due-dates
- On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
- Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
- Genetic Algorithms and Random Keys for Sequencing and Optimization
- Fuzzy sets
- AN EVOLUTIONARY ALGORITHM FOR PURE FUZZY FLOWSHOP SCHEDULING PROBLEMS
This page was built for publication: USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES