Master production schedule time interval strategies in make-to-order supply chains¶
From MaRDI portal
Publication:3533180
DOI10.1080/00207540600957381zbMath1153.90435OpenAlexW1994967043MaRDI QIDQ3533180
Li-Lian Gao, Funda Sahin, E. Powell jun. Robinson
Publication date: 23 October 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600957381
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (1)
Cites Work
- Lot sizing and scheduling -- survey and extensions
- Multiple level production planning in rolling horizon assembly environments
- Single item lot sizing problems
- A new family of power transformations to improve normality or symmetry
- Dynamic Version of the Economic Lot Size Model
- Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem
- Rolling horizon production planning for probabilistic time-varying demands
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
- Parameters affecting the effectiveness of MRP systems: A review
- Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
- Questioning the relative virtues of dynamic lot sizing rules
This page was built for publication: Master production schedule time interval strategies in make-to-order supply chains¶