Multi-agent-based workload control for make-to-order manufacturing
From MaRDI portal
Publication:3533191
DOI10.1080/00207540600969758zbMath1151.90439OpenAlexW2046432292MaRDI QIDQ3533191
No author found.
Publication date: 23 October 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600969758
Related Items
The mechanisms of labor division from the perspective of individual optimization, Smart workload input-output control of production systems: a proof of concept
Cites Work
- Survey of scheduling research involving due date determination decisions
- Lead time selection and the behaviour of work flow in job shops
- A heuristic for single machine scheduling with early and tardy costs
- Effective neighbourhood functions for the flexible job shop problem
- A Multi-Agent Framework for the Coordination and Integration of Information Systems
- Due date assignment using artificial neural networks under different shop floor control strategies
- A Proof for the Queuing Formula: L = λW
- A Broader View of the Job-Shop Scheduling Problem
- Order review and release strategies ina job shop environment: A review and a classification
- Evaluating variance control, order review/release and dispatching: a regression analysis
- A dynamic forecasting model for job shop flowtime prediction and tardiness control
- Workshop scheduling using practical (inaccurate) data Part 3: A framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule
- Linguistic-based meta-heuristic optimization model for flexible job shop scheduling