An integrated production and maintenance model for one failure prone machine-finite capacity buffer system for perishable products with constant demand
From MaRDI portal
Publication:3541191
DOI10.1080/00207540802273660zbMath1157.90385OpenAlexW1971257489MaRDI QIDQ3541191
Anis Chelbi, Mehdi Radhoui, Daoud Ait-Kadi
Publication date: 25 November 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802273660
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Related Items
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times ⋮ Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
Cites Work
- The impact of preventive maintenance on system cost and buffer size
- Maintenance optimization of a production system with buffer capacity
- Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
- Production Lot Sizing with Machine Breakdowns
- Production Batching with Machine Breakdowns and Safety Stocks
- A Numerical Algorithm for Recursively-Defined Convolution Integrals Involving Distribution Functions