A PARTICLE SWARM OPTIMIZATION-BASED ALGORITHM FOR JOB-SHOP SCHEDULING PROBLEMS
From MaRDI portal
Publication:3573666
DOI10.1142/S0219876205000569zbMath1189.90060OpenAlexW2028772506MaRDI QIDQ3573666
No author found.
Publication date: 1 July 2010
Published in: International Journal of Computational Methods (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0219876205000569
Related Items (1)
Cites Work
- Problem difficulty for tabu search in job-shop scheduling
- A branch-and-bound algorithm for the resource-constrained project scheduling problem
- An efficient genetic algorithm for job shop scheduling with tardiness objectives.
- Some new results on simulated annealing applied to the job shop scheduling problem
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects
- A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
- The two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithm
- A tabu search method guided by shifting bottleneck for the job shop scheduling problem
- A revised simulated annealing algorithm for obtaining the minimum total tardiness in job shop scheduling problems
- A new adaptive neural network and heuristics hybrid approach for job-shop scheduling
This page was built for publication: A PARTICLE SWARM OPTIMIZATION-BASED ALGORITHM FOR JOB-SHOP SCHEDULING PROBLEMS