SOLVING A MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH TIMED PETRI NETS AND GENETIC ALGORITHM
From MaRDI portal
Publication:3575380
DOI10.1142/S1793830910000607zbMath1191.90017OpenAlexW2114400506MaRDI QIDQ3575380
Publication date: 27 July 2010
Published in: Discrete Mathematics, Algorithms and Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s1793830910000607
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Cites Work
This page was built for publication: SOLVING A MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH TIMED PETRI NETS AND GENETIC ALGORITHM