An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
From MaRDI portal
Publication:3605435
DOI10.1080/00207540701420560zbMath1154.90353OpenAlexW2145088741MaRDI QIDQ3605435
Francisco Ballestín, Norbert Trautmann
Publication date: 24 February 2009
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701420560
reactive schedulingresource-constrained project schedulingjust-in-time productioniterated-local-searchweighted earliness-tardiness cost
Related Items (7)
A hybrid iterated local search algorithm with adaptive perturbation mechanism by success-history based parameter adaptation for differential evolution (SHADE) ⋮ Parallel ant colony optimization for resource constrained job scheduling ⋮ Resource constraint scheduling with a fractional shared resource ⋮ A hybrid differential evolution algorithm with column generation for resource constrained job scheduling ⋮ Stochastic project scheduling with hierarchical alternatives ⋮ Modeling and solving a bi-objective airport slot scheduling problem ⋮ Scheduling projects with limited number of preemptions
Cites Work
- A decomposition approach for a resource constrained scheduling problem
- A decomposition approach in a DSS for a resource constrained scheduling problem
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- Resource-constrained project scheduling: A critical activity reordering heuristic
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Advanced production scheduling for batch plants in process industries
- Scheduling of Project Networks by Job Assignment
- Sequencing with Earliness and Tardiness Penalties: A Review
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
This page was built for publication: An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem