Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A Column Generation Based Destructive Lower Bound for Resource Constrained Project Scheduling Problems

From MaRDI portal
Publication:3612431
Jump to:navigation, search

DOI10.1007/978-3-540-72397-4_27zbMath1214.90061OpenAlexW1693081439MaRDI QIDQ3612431

Hoogeveen, J. A., J. M. van den Akker, G. Diepen

Publication date: 10 March 2009

Published in: Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/978-3-540-72397-4_27


zbMATH Keywords

linear programmingcolumn generationgeneralized precedence constraintscumulative constraintresource constrained project scheduling


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (2)

A preemptive bound for the resource constrained project scheduling problem ⋮ Energetic reasoning for energy-constrained scheduling with a continuous resource







This page was built for publication: A Column Generation Based Destructive Lower Bound for Resource Constrained Project Scheduling Problems

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3612431&oldid=17035233"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 5 February 2024, at 04:14.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki