Design and control of agile automated CONWIP production lines
From MaRDI portal
Publication:3621911
DOI10.1002/nav.20325zbMath1158.90370OpenAlexW1968131732MaRDI QIDQ3621911
Robert W. Lien, Biying Shou, Wallace J. Hopp, Seyed M. R. Iravani
Publication date: 22 April 2009
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.20325
Related Items (1)
Cites Work
- Unnamed Item
- Bounds and approximations for cycle times of a \(U\)-shaped production line
- A two-stage tandem queue attended by a moving server with holding and switching costs
- Optimal dynamic assignment of a flexible worker on an open production line with specialists
- Control of a Single-Server Tandem Queueing System with Setups
- Optimal use of an extra server in a two station tandem queueing network
- Performance of Bucket Brigades When Work Is Stochastic
- Push and Pull Production Systems: Issues and Comparisons
- A Queuing Network Model of a Single-Operator Manufacturing Workcell with Machine/Operator Interference
- Self-Buffering, Self-Balancing, Self-Flushing Production Lines
- ANALYSIS AND OPTIMIZATION OF A U-SHAPED PRODUCTION LINE
- A Production Line that Balances Itself
- Optimal stochastic scheduling of a two-stage tandem queue with parallel servers
- Serial Agile Production Systems with Automation
This page was built for publication: Design and control of agile automated CONWIP production lines