Client‐contractor bargaining on net present value in project scheduling with limited resources
From MaRDI portal
Publication:3621917
DOI10.1002/nav.20331zbMath1158.90349OpenAlexW2103380475MaRDI QIDQ3621917
Gündüz Ulusoy, Nursel Kavlak, Funda Sivrikaya-Serifoglu, İlker Birbil
Publication date: 22 April 2009
Published in: Naval Research Logistics (NRL) (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.20331
Related Items (5)
Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap ⋮ Project scheduling with finite or infinite number of activity processing modes -- a survey ⋮ An agency perspective for multi-mode project scheduling with time/cost trade-offs ⋮ Metaheuristics for multi-mode capital-constrained project payment scheduling ⋮ Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective
Uses Software
Cites Work
- Unnamed Item
- Project network models with discounted cash flows a guided tour through recent developments
- Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows
- PSPLIB -- a project scheduling problem library
- An equitable approach to the payment scheduling problem in project management
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
- Scheduling a project to maximize its net present value: An integer programming approach
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
- Trading bargaining weights
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- The Impact of Contractor Behavior on the Client’s Payment-Scheduling Problem
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- On modelling payments in projects
- Performance of the heuristic procedures for constrained projects with progress payments
- Heuristic scheduling of resource-constrained projects with cash flows
- Cash Flows in Networks
- The payment scheduling problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project Scheduling with Discounted Cash Flows and Progress Payments
- Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds
- Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows
This page was built for publication: Client‐contractor bargaining on net present value in project scheduling with limited resources