Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
From MaRDI portal
Publication:3623397
DOI10.1080/00207540701486082zbMath1158.90357OpenAlexW2131737760MaRDI QIDQ3623397
No author found.
Publication date: 20 April 2009
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701486082
Related Items (8)
Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times ⋮ Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis ⋮ The third comprehensive survey on scheduling problems with setup times/costs ⋮ Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times ⋮ Metamodel-based simulation optimization considering a single stochastic constraint ⋮ Optimization of setup times in the furniture industry ⋮ Heuristics for no-wait flowshops with makespan subject to mean completion time ⋮ Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
Cites Work
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis
- Job shop scheduling with separable sequence-dependent setups
- A branch \(\&\) bound method for the general-shop problem with sequence dependent setup-times
- Metamodels in manufacturing: a review
- Impact of sequence-dependent setup time on job shop scheduling performance
- Survey of scheduling research involving setup times
This page was built for publication: Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times