Integrated Production and Delivery Scheduling with Disjoint Windows
DOI10.1007/978-3-642-02026-1_45zbMath1246.90057OpenAlexW1554974232MaRDI QIDQ3637094
Xin Wang, Joseph Y.-T. Leung, Yumei Huo
Publication date: 7 July 2009
Published in: Combinatorial Optimization and Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-02026-1_45
single machineNP-hardperishable goodsstrong NP-hardparallel and identical machinesfully polynomial time approximation schemes
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Computational difficulty of problems (lower bounds, completeness, difficulty of approximation, etc.) (68Q17) Approximation algorithms (68W25)
This page was built for publication: Integrated Production and Delivery Scheduling with Disjoint Windows