Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Scheduling Problems with Two Competing Agents - MaRDI portal

Scheduling Problems with Two Competing Agents

From MaRDI portal
Publication:3637420

DOI10.1287/opre.1030.0092zbMath1165.90446OpenAlexW2155047985MaRDI QIDQ3637420

Andrea Pacifici, Pitu B. Mirchandani, Alessandro Agnetis, Dario Pacciarelli

Publication date: 10 July 2009

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: http://hdl.handle.net/2108/34731




Related Items (only showing first 100 items - show all)

Two-agent scheduling problems on a single-machine to minimize the total weighted late workTwo heuristic methods based on decomposition to the integrated multi-agent supply chain scheduling and distribution problemOptimizing the half-product and related quadratic Boolean functions: approximation and scheduling applicationsCompetitive two-agent scheduling problems to minimize the weighted combination of makespans in a two-machine open shopMulti-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobsMultitasking scheduling problems with two competitive agentsA SINGLE-MACHINE TWO-AGENT SCHEDULING PROBLEM BY GA APPROACHA note on the complexity of the problem of two-agent scheduling on a single machineUnary NP-hardness of minimizing the number of tardy jobs with deadlinesScheduling with two competing agents to minimize total weighted earlinessTwo-agent flowshop scheduling to maximize the weighted number of just-in-time jobsScheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness MeasuresHierarchical optimization on an unbounded parallel-batching machineTwo-agent scheduling of time-dependent jobsMulti-agent scheduling on a single machine with a fixed number of competing agents to minimize the weighted sum of number of tardy jobs and makespansScheduling with competing agents, total late work and job rejectionBicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late workTwo‐agent scheduling with linear resource‐dependent processing timesPareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late workPareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late workA survey of due-date related single-machine with two-agent scheduling problemSingle-machine past-sequence-dependent setup times scheduling with resource allocation and learning effectTwo-agent single-machine scheduling with release dates to minimize the makespanTwo-agent single-machine scheduling with a rate-modifying activityAlgorithms for a two‐machine flowshop problem with jobs of two classesAn ERNSGA‐III algorithm for the production and distribution planning problem in the multiagent supply chainSingle-machine preemptive scheduling with release dates involving the total weighted late work criterionHyper-heuristic for integrated due-window scheduling and vehicle routing problem for perishable products considering production qualityA Lagrangian heuristics for balancing the average weighted completion times of two classes of jobs in a single-machine scheduling problemCompetitive two-agent scheduling with release dates and preemption on a single machineA note on a two-agent scheduling problem related to the total weighted late workTwo-Machine and Two-Agent Flow Shop with Special Processing Times StructuresSingle-machine scheduling with multi-agents to minimize total weighted late workTwo-Agent Scheduling with Linear Deteriorating Jobs on a Single MachineSingle-machine scheduling of multiple projects with controllable processing timesA multiple-criterion model for machine scheduling with constant deteriorating jobsScheduling two agents on uniform parallel machines with~makespan and cost functionsSingle-machine multi-agent scheduling problems with a global objective functionUnbounded parallel-batching scheduling with two competitive agentsBounded parallel-batching scheduling with two competing agentsSerial-batching scheduling with two agents to minimize makespan and maximum costScheduling two projects with controllable processing times in a single-machine environmentScheduling two agents with sum-of-processing-times-based deterioration on a single machineA just-in-time scheduling problem with two competing agentsOnline single-machine scheduling to minimize the linear combination of makespans of two agentsMulti-agent scheduling on a single machine with max-form criteriaTwo competitive agents to minimize the weighted total late work and the total completion timeTwo-agent single-machine scheduling with assignable due datesTwo-agent single-machine scheduling problem with just-in-time jobsMulti-agent single machine schedulingA market-based multi-agent system model for decentralized multi-project schedulingA common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problemsA multi-agent system for the weighted earliness tardiness parallel machine problemGroup Scheduling with Two Competing Agents on a Single MachineGenetic Algorithm for a Two-Agent Scheduling Problem with Truncated Learning ConsiderationA Lagrangian approach to single-machine scheduling problems with two competing agentsTwo-agent scheduling on a single machine with release datesA job shop distributed scheduling based on Lagrangian relaxation to minimise total completion timeA Batch Scheduling Problem with Two AgentsA subset-sum type formulation of a two-agent single-machine scheduling problemA Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work CriterionMulti-agent scheduling on a single machine to minimize total weighted number of tardy jobsTwo-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteriaND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum costThe complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobsTwo approximation algorithms for two-agent scheduling on parallel machines to minimize makespanA review of four decades of time-dependent scheduling: main results, new topics, and open problemsBicriteria scheduling of equal length jobs on uniform parallel machinesAn approximation algorithm for multi-agent scheduling on two uniform parallel machinesAn algorithm for multi-agent scheduling to minimize the makespan on \(m\) parallel machinesSINGLE MACHINE FAMILY SCHEDULING WITH TWO COMPETING AGENTS TO MINIMIZE MAKESPANScheduling with release dates and preemption to minimize multiple max-form objective functionsSupply chain scheduling in a collaborative manufacturing mode: model construction and algorithm designSingle Machine Two-Agent Scheduling with Deteriorating JobsAn Ordered Flow Shop with Two AgentsTwo-agent scheduling with rejection on a single machineTwo-agent single-machine scheduling with release dates and preemption to minimize the maximum latenessProportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late JobsMin–Max Scheduling of Batch or Drop-Line Jobs Under Agreeable Release and Processing TimesTwo agent scheduling with a central selection mechanismScheduling two agent task chains with a central selection mechanismA note on the preemptive scheduling to minimize total completion time with release time and deadline constraintsSingle machine scheduling with two competing agents, arbitrary release dates and unit processing timesTwo-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependentA new approximation algorithm for multi-agent scheduling to minimize makespan on two machinesSingle-machine serial-batch delivery scheduling with two competing agents and due date assignmentHierarchical optimization with double due dates on an unbounded parallel-batching machine to minimize maximum latenessFast approximation algorithms for bi-criteria scheduling with machine assignment costsBicriteria scheduling on a series-batching machine to minimize maximum cost and makespanPareto-scheduling of two competing agents with their own equal processing timesPareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum costSingle machine scheduling with aging effect and upper-bounded actual processing timesMathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activitiesProportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobsSingle machine scheduling with two competing agents and equal job processing timesA note on scheduling problems with competing agents and earliness minimization objectivesDesign of automated negotiation mechanisms for decentralized heterogeneous machine schedulingTwo-agent scheduling in a flowshopRouting and scheduling problems with two agents on a line-shaped networkScheduling two job families on a single machine with two competitive agents




This page was built for publication: Scheduling Problems with Two Competing Agents