Flow Shop Problems with Time Lags
From MaRDI portal
Publication:3659509
DOI10.1287/mnsc.29.4.477zbMath0513.90036OpenAlexW1990278545MaRDI QIDQ3659509
Publication date: 1983
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.29.4.477
approximate solutionstime lagsextension of the classical flow shop problemlower completion time bounds
Related Items (7)
An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal ⋮ The flow shop problem with time lags and separated setup times ⋮ An approximate solution of the flow-shop problem with sequence dependent setup times ⋮ Flowshop-scheduling problems with makespan criterion: a review ⋮ Time lag size in multiple operations flow shop scheduling heuristics ⋮ Clustered flow shop models ⋮ Reduction of job-shop problems to flow-shop problems with precedence constraints
This page was built for publication: Flow Shop Problems with Time Lags