Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints - MaRDI portal

Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints

From MaRDI portal
Publication:367232

DOI10.1007/s10852-012-9180-xzbMath1311.90045OpenAlexW2088175624MaRDI QIDQ367232

Taïcir Loukil, Emna Dhouib, Jacques jun. Teghem

Publication date: 26 September 2013

Published in: Journal of Mathematical Modelling and Algorithms in Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10852-012-9180-x




Related Items (8)



Cites Work


This page was built for publication: Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints