Equipment location in machining transfer lines with multi-spindle heads
From MaRDI portal
Publication:367253
DOI10.1007/S10852-012-9196-2zbMath1311.90068OpenAlexW2012502330MaRDI QIDQ367253
Fatme Makssoud, Alexandre Dolgui, Olga Battaïa, Evgeny E. Gurevsky
Publication date: 26 September 2013
Published in: Journal of Mathematical Modelling and Algorithms in Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10852-012-9196-2
Cites Work
- Minimizing makespan for multi-spindle head machines with a mobile table
- Reduction approaches for a generalized line balancing problem
- An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
- A heuristic multi-start decomposition approach for optimal design of serial machining lines
- Integrated assembly line balancing with resource restrictions
- Springer Handbook of Automation
- Balancing of manufacturing systems with complex configurations for delayed product differentiation
- Bi criteria flexible assembly line design problem with equipment decisions
This page was built for publication: Equipment location in machining transfer lines with multi-spindle heads