Note—A Note on “Efficiency of the Antithetic Variate Method for Simulating Stochastic Networks”
From MaRDI portal
Publication:3674390
DOI10.1287/mnsc.29.3.381zbMath0523.90053OpenAlexW1972464308MaRDI QIDQ3674390
Publication date: 1983
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.29.3.381
PERTstochastic networkestimation of project completion timeantithetic variate simulation methodestimation of project length
Monte Carlo methods (65C05) Deterministic scheduling theory in operations research (90B35) Deterministic network models in operations research (90B10)
Related Items (1)
This page was built for publication: Note—A Note on “Efficiency of the Antithetic Variate Method for Simulating Stochastic Networks”