Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions
From MaRDI portal
Publication:3677491
DOI10.1007/BF01920918zbMath0563.90058MaRDI QIDQ3677491
Publication date: 1984
Published in: Zeitschrift für Operations Research (Search for Journal in Brave)
Related Items (3)
The flow shop problem with time lags and separated setup times ⋮ Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints ⋮ Flowshop-scheduling problems with makespan criterion: a review
Cites Work
This page was built for publication: Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions