Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article - MaRDI portal

scientific article

From MaRDI portal
Publication:3680271

zbMath0565.68037MaRDI QIDQ3680271

Jacek Błażewicz

Publication date: 1984


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (45)

Two-agent scheduling problems on a single-machine to minimize the total weighted late workMinimizing the weighted number of tardy task unitsSemi-online scheduling on two identical machines with a common due date to maximize total early workMinimizing the total weighted late work in scheduling of identical parallel processors with communication delaysScheduling imprecise computation tasks on uniform processorsTwo-machine flow-shop scheduling to minimize total late work: revisitedMetaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due dateA single machine scheduling problem to minimize total early workMinimizing total weighted late work on a single-machine with non-availability intervalsScheduling imprecise computation tasks with \(0/1\)-constraintPolynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early workA note on the two machine job shop with the weighted late work criterionScheduling with competing agents, total late work and job rejectionA common approximation framework for early work, late work, and resource leveling problemsSingle machine scheduling with common assignable due date/due window to minimize total weighted early and late workA parallel-machine scheduling problem with an antithetical property to maximize total weighted early workBicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late workVariable neighborhood search for the single machine scheduling problem to minimize the total early workPareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late workPareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late workMaximizing total early work in a distributed two‐machine flow‐shopA survey of due-date related single-machine with two-agent scheduling problemExact approaches to late work scheduling on unrelated machinesSingle-machine preemptive scheduling with release dates involving the total weighted late work criterionA note on a two-agent scheduling problem related to the total weighted late workA new perspective on single-machine scheduling problems with late work related criteriaSingle-machine scheduling with multi-agents to minimize total weighted late workA two-agent single-machine scheduling problem with late work criteriaScheduling on parallel identical machines with late work criterion: offline and online casesOpen shop scheduling problems with late work criteria.Two competitive agents to minimize the weighted total late work and the total completion timeApproximation algorithms for scheduling a single machine to minimize total late workPreemptive models of scheduling with controllable processing times and of scheduling with imprecise computation: a review of solution approachesScheduling two agents with controllable processing timesThe two-machine flow-shop problem with weighted late work criterion and common due dateMinimizing mean weighted execution time loss on identical and uniform processorsMinimizing total late work on a single machine with generalized due-datesA Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work CriterionMinimizing total weighted late work in the resource-constrained project scheduling problemFully polynomial time approximation scheme to maximize early work on parallel machines with common due dateMirror scheduling problems with early work and late work criteriaA note on a single machine scheduling problem with generalized total tardiness objective functionSingle-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late worksA Parallel Machine Scheduling Problem Maximizing Total Weighted Early WorkTwo-machine flow shop scheduling with a common due date to maximize total early work




This page was built for publication: