scientific article
From MaRDI portal
Publication:3686412
zbMath0569.90037MaRDI QIDQ3686412
Publication date: 1985
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
precedence constraintsoptimal scheduleFlexible Manufacturing Systemssequence-dependent changeover costs
Related Items (6)
The effect of strengthened linear formulations on improving the lower bounds for the part families with precedence constraints problem ⋮ Classification of travelling salesman problem formulations ⋮ A production planning problem in FMS ⋮ Scheduling flexible machining and assembly systems ⋮ On symmetric subtour problems ⋮ A genetic algorithm for scheduling open shops with sequence-dependent setup times
This page was built for publication: