Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

TWO-AND THREE-MACHINE FLOW-SHOP MAKESPAN SCHEDULING PROBLEMS WITH ADDITIONAL TIMES SEPARATED FROM PROCESSING TIMES

From MaRDI portal
Publication:3703568
Jump to:navigation, search

DOI10.15807/jorsj.27.348zbMath0581.90038OpenAlexW2185440801MaRDI QIDQ3703568

Ichiro Nabeshima, Shigeko Maruyama

Publication date: 1984

Published in: Journal of the Operations Research Society of Japan (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.15807/jorsj.27.348


zbMATH Keywords

sufficient optimality conditionsapproximate sequenceadditional timestwo- and three-machine flow-shop makespan scheduling


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (2)

A two-machine flowshop scheduling problem with a separated maintenance constraint ⋮ Two-machine flowshop group scheduling problem




This page was built for publication: TWO-AND THREE-MACHINE FLOW-SHOP MAKESPAN SCHEDULING PROBLEMS WITH ADDITIONAL TIMES SEPARATED FROM PROCESSING TIMES

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3703568&oldid=33797060"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 25 April 2024, at 16:47.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki