Scheduling with Multiple Performance Measures: The One-Machine Case
From MaRDI portal
Publication:3740551
DOI10.1287/mnsc.32.4.464zbMath0603.90070OpenAlexW2038781246MaRDI QIDQ3740551
Rakesh K. Sarin, Richard L. Daniels, Rosser T. Nelson
Publication date: 1986
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.32.4.464
single machinemulticriteria schedulingsingle stagedeterministic job shopmore than one performance measure
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items
An interactive procedure for bi-criteria production scheduling, Incorporating preference information into multi-objective scheduling, On the Modeling Tactics of Research Extensions in Production/Operations Management, A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process, Solving multi-objective production scheduling problems using metaheuristics, Multicriteria scheduling using fuzzy theory and tabu search, An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem, On the existence of schedules that are near-optimal for both makespan and total weighted completion time, Evaluating solution sets of a posteriori solution techniques for bi-criteria combinatorial optimization problems, A survey of single machine scheduling to minimize weighted number of tardy jobs, Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time, Multiple and bicriteria scheduling: A literature survey, Assignment of a job load in a distributed system: A multicriteria design method, Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem, Single-machine multi-agent scheduling problems with a global objective function, A multi-objective approach to resource allocation in single machine scheduling, Single machine sequencing with nonlinear multicriteria cost functions: An application of generalized dynamic programming, A new lower bound approach for single-machine multicriteria scheduling, Use of variable range in solving multiple criteria scheduling problems, Tradeoff between setup times and carrying costs for finished items, An intelligent algorithm for mixed-integer programming models, Scheduling tasks on moving executors to minimise the maximum lateness, A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling, Multicriteria scheduling problems: a survey, Single machine batch scheduling with two non-disjoint agents and splitable jobs, KBSS: A knowledge-based system for scheduling in automated manufacturing, Mathematical Modeling of Scheduling Problems, Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion, A bicriteria approach to the two-machine flow shop scheduling problem, Exploiting process plan flexibility in production scheduling: A multi-objective approach, Counting and enumeration complexity with application to multicriteria scheduling, Genetic algorithms for the two-stage bicriteria flowshop problem, Scheduling unit processing time jobs on a single machine with multiple criteria, Scheduling with release dates and preemption to minimize multiple max-form objective functions, New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs, Multicriteria scheduling