Multilevel Scheduling of Multistage Production with Limited In-Process Inventory
From MaRDI portal
Publication:3757669
DOI10.2307/2582402zbMath0619.90035OpenAlexW4241290719MaRDI QIDQ3757669
Publication date: 1987
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.2307/2582402
parallel machinesmultilevel programminghierarchical schedulinglimited in-process buffersmultistage, multiproduct production scheduling
This page was built for publication: Multilevel Scheduling of Multistage Production with Limited In-Process Inventory