On the Distribution of Activity Time in PERT
From MaRDI portal
Publication:3787781
DOI10.1057/jors.1988.132zbMath0644.90051OpenAlexW1997806784MaRDI QIDQ3787781
Publication date: 1988
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1988.132
Deterministic scheduling theory in operations research (90B35) Survival analysis and censored data (62N99) Statistical distribution theory (62E99)
Related Items (12)
Risk taking in stochastic PERT networks ⋮ The most critical path in a PERT network: A heuristic approach ⋮ A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept ⋮ An alternative for robust estimation in project management ⋮ How adding new information modifies the estimation of the mean and the variance in PERT: a maximum entropy distribution approach ⋮ Mixture densities for project management activity times: A robust approach to PERT ⋮ An approximation of the activity duration distribution in PERT. ⋮ A dependent project evaluation and review technique: a Bayesian network approach ⋮ Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods) ⋮ Incentive schemes for resolving Parkinson's law in project management ⋮ The model identification of beta distribution based on quantiles ⋮ A note on the reasonableness of PERT hypotheses
This page was built for publication: On the Distribution of Activity Time in PERT