A Mixed-Integer Goal-Programming Formulation of the Standard Flow-Shop Scheduling Problem
From MaRDI portal
Publication:3790927
DOI10.2307/2582302zbMath0646.90041OpenAlexW4230795056MaRDI QIDQ3790927
Publication date: 1986
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.2307/2582302
Mixed integer programming (90C11) Sensitivity, stability, parametric optimization (90C31) Deterministic scheduling theory in operations research (90B35)
Related Items
Solving multi-objective production scheduling problems using metaheuristics, A real-time order acceptance and scheduling approach for permutation flow shop problems, An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem, On the exact solution of the no-wait flow shop problem with due date constraints, Bilevel programming applied to the flow shop scheduling problem, A combined branch-and bound and genetic algorithm based approach for a flowshop scheduling problem, Multiple and bicriteria scheduling: A literature survey, A nonlinear mixed integer goal programming model for the two-machine closed flow shop, A bicriteria flowshop scheduling with a learning effect, Multicriteria scheduling problems: a survey, KBSS: A knowledge-based system for scheduling in automated manufacturing, A two-step approach to incorporate cut-off grade and stockpiling in oil sands mine planning optimization framework, Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation, A multicriteria decision-making approach to university resource allocations and information infrastructure planning