Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Integration of priority dispatching and due-date assignment in a job shop

From MaRDI portal
Publication:3799803
Jump to:navigation, search

DOI10.1080/00207728808964077zbMath0653.90033OpenAlexW2133198501MaRDI QIDQ3799803

Cheng, T. C. Edwin

Publication date: 1988

Published in: International Journal of Systems Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207728808964077

zbMATH Keywords

job shop schedulingsimulation studyjob dispatchingjob flow-timedue- date assignmentmissed due-dates


Mathematics Subject Classification ID

Probabilistic models, generic numerical methods in probability and statistics (65C20) Deterministic scheduling theory in operations research (90B35)


Related Items

Survey of scheduling research involving due date determination decisions, Real-time due-date promising by build-to-order environments



Cites Work

  • Unnamed Item
  • A Survey of Scheduling Rules
  • Review of sequencing research
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3799803&oldid=17365344"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 5 February 2024, at 15:09.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki