scientific article
From MaRDI portal
Publication:3806976
zbMATH Open0657.90053MaRDI QIDQ3806976
Publication date: 1986
Title of this publication is not available (Why is that?)
heuristicpolynomial algorithmsNP-completetwo-machine flow-shopmaximum job completion timejob processing times
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
Recommendations
- Title not available (Why is that?) ๐ ๐
- Minimizing total completion time in a two-machine flow shop with deteriorating jobs ๐ ๐
- Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times ๐ ๐
- Two-machine flowshop scheduling to minimize mean flow time ๐ ๐
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases ๐ ๐
- Minimizing the total flow time and the tardiness in a two-machine flow shop ๐ ๐
- Stochastically Minimizing Total Penalty Costs in the Two-Machine Flow Shop with Random Processing Times ๐ ๐
- Minimizing Mean Flow Time in Two-Machine Open Shops and Flow Shops ๐ ๐
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases ๐ ๐
- Minimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speeds ๐ ๐
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3806976)