Analysis of project scheduling strategies in a client-contractor environment
From MaRDI portal
Publication:3809577
DOI<link itemprop=identifier href="https://doi.org/10.1002/1520-6750(198902)36:1<69::AID-NAV3220360106>3.0.CO;2-E" /><69::AID-NAV3220360106>3.0.CO;2-E 10.1002/1520-6750(198902)36:1<69::AID-NAV3220360106>3.0.CO;2-EzbMath0659.90055OpenAlexW1976122967MaRDI QIDQ3809577
Giri Kumar Tayi, Joshua B. Levy
Publication date: 1989
Full work available at URL: https://doi.org/10.1002/1520-6750(198902)36:1<69::aid-nav3220360106>3.0.co;2-e
This page was built for publication: Analysis of project scheduling strategies in a client-contractor environment