Interrelationships between performance measures for the machine-repairman problem
From MaRDI portal
Publication:3821915
DOI<link itemprop=identifier href="https://doi.org/10.1002/1520-6750(198906)36:3<265::AID-NAV3220360304>3.0.CO;2-F" /><265::AID-NAV3220360304>3.0.CO;2-F 10.1002/1520-6750(198906)36:3<265::AID-NAV3220360304>3.0.CO;2-FzbMath0668.90035OpenAlexW2039241394MaRDI QIDQ3821915
Publication date: 1989
Full work available at URL: https://doi.org/10.1002/1520-6750(198906)36:3<265::aid-nav3220360304>3.0.co;2-f
performance measuresheterogeneous machinesmachine-repairman problemmultiple repairmensteady-state relationships
Related Items (4)
A survey of the machine interference problem ⋮ Queueing analysis of a mobile trunked system with mixed traffic and finite population ⋮ Complementarity between the finite capacity and finite source queuing systems ⋮ Age repair policies for the machine repair problem
Cites Work
This page was built for publication: Interrelationships between performance measures for the machine-repairman problem