Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article - MaRDI portal

scientific article

From MaRDI portal
Publication:3821925

zbMath0668.90045MaRDI QIDQ3821925

Slowinski, Roman, Wojciech Cellary, Jan Weglarz, Jacek Błażewicz

Publication date: 1986


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (43)

On the complexity of preemptive openshop scheduling problemsDSS for multiobjective project schedulingComputing redundant resources for the resource constrained project scheduling problemA preemptive open shop scheduling problem with one resourceOn the two-phase method for preemptive schedulingPreassignment requirements in chromatic schedulingA variant of the permutation flow shop model with variable processing timesOn relocation problems with multiple identical working crewsReal-time scheduling of an automated manufacturing centerMaximizing system lifetime in wireless sensor networksRestrictions and preassignments in preemptive open shop schedulingUET-scheduling with chain-type precedence constraintsFaster and simpler approximation algorithms for mixed packing and covering problemsProject scheduling with finite or infinite number of activity processing modes -- a surveyOn linear lower bounds for the resource constrained project scheduling problem.Approximate strong separation with application in fractional graph coloring and preemptive scheduling.A genetic algorithm for scheduling open shops with conflict graphs to minimize the makespanTight complexity analysis of the relocation problem with arbitrary release datesParallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints.Flow shop scheduling problem with conflict graphsScheduling problems for parallel dedicated machines under multiple resource constraints.Restricted assignment scheduling with resource constraintsAlmost nonpreemptive schedulesNew complexity results for shop scheduling problems with agreement graphsSome preemptive open shop scheduling problems with a renewable or a nonrenewable resourceFour decades of research on the open-shop scheduling problem to minimize the makespanThe cyclic compact open-shop scheduling problemResource-constrained flowshop scheduling with separate resource recycling operationsMultiprocessor scheduling under precedence constraints: polyhedral resultsComputational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problemsAlgorithms for minimizing maximum lateness with unit length tasks and resource constraintsThe multi-mode resource-constrained project scheduling problem with generalized precedence relationsExploiting process plan flexibility in production scheduling: A multi-objective approachPolynomial algorithms for resource-constrained and multiprocessor task scheduling problemsExtensions of coloring models for scheduling purposesHeuristics for multimode scheduling problems with dedicated resourcesScheduling Multilayer Divisible ComputationsTwo-machine open shop problem with agreement graphThe complexity of scheduling jobs in repetitive manufacturing systemsOpen shops with jobs overlapMathematical programming formulations for machine scheduling: A surveyParallel machine scheduling with additional resources: notation, classification, models and solution methodsOpen shop scheduling problems with conflict graphs



Cites Work


This page was built for publication: