Preemptive scheduling with staircase and piecewise linear resource availability
DOI10.1007/BF01416077zbMath0675.90045OpenAlexW1998418916MaRDI QIDQ3830806
Slowinski, Roman, Dominique de Werra, Maurice Cochand
Publication date: 1989
Published in: [https://portal.mardi4nfdi.de/entity/Q3031760 ZOR Zeitschrift f�r Operations Research Methods and Models of Operations Research] (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf01416077
flexible manufacturing systemspreemptive schedulingnonrenewable resourcesresource constraintstwo-phase methodtotally unimodular matricesunrelated processorstime-varying supply
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items
Cites Work
- Unnamed Item
- Preemptive scheduling of independent jobs on parallel machines subject to financial constraints
- Cost-minimal preemptive scheduling of independent jobs with release and due dates on open shop under resource constraints
- Preemptive Scheduling, Linear Programming and Network Flows
- A decomposition property of polyhedra
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- On Preemptive Scheduling of Unrelated Parallel Processors by Linear Programming