Batch scheduling with deteriorating jobs to minimize the total completion time
From MaRDI portal
Publication:384194
DOI10.1007/S40305-013-0019-6zbMath1277.90051OpenAlexW1969006279MaRDI QIDQ384194
Juan Zou, Cuixia Miao, Yu-Zhong Zhang, Yun-Jie Xia
Publication date: 27 November 2013
Published in: Journal of the Operations Research Society of China (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s40305-013-0019-6
Related Items (1)
Cites Work
- An FPTAS for uniform machine scheduling to minimize makespan with linear deterioration
- Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
- Single machine parallel-batch scheduling with deteriorating jobs
- Scheduling a batching machine
- Bounded parallel-batch scheduling on single and multi machines for deteriorating jobs
- Scheduling with batching: A review
- Single machine unbounded parallel-batch scheduling with forbidden intervals
This page was built for publication: Batch scheduling with deteriorating jobs to minimize the total completion time