Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

An almost tight lower bound for the scheduling problem to meet two min-sum objectives

From MaRDI portal
Publication:384219
Jump to:navigation, search

DOI10.1007/S40305-012-0002-7zbMath1281.90041OpenAlexW1983854422MaRDI QIDQ384219

Dong-lei Du, Da-Chuan Xu

Publication date: 27 November 2013

Published in: Journal of the Operations Research Society of China (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s40305-012-0002-7


zbMATH Keywords

schedulingapproximation algorithmbi-criteria


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27) Approximation algorithms (68W25)





Cites Work

  • An improved lower bound for a bi-criteria scheduling problem
  • On the existence of schedules that are near-optimal for both makespan and total weighted completion time
  • A note on scheduling to meet two min-sum objectives




This page was built for publication: An almost tight lower bound for the scheduling problem to meet two min-sum objectives

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:384219&oldid=12258095"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 30 January 2024, at 03:14.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki