Inequalities for the Completion Times of Stochastic PERT Networks
From MaRDI portal
Publication:3863419
DOI10.1287/moor.4.4.441zbMath0427.90053OpenAlexW2079724820MaRDI QIDQ3863419
Publication date: 1979
Published in: Mathematics of Operations Research (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/872252268a81429d952104ccbb3c56a7a726cd58
Programming involving graphs or networks (90C35) Stochastic programming (90C15) Deterministic scheduling theory in operations research (90B35)
Related Items (13)
Risk taking in stochastic PERT networks ⋮ A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing ⋮ A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network ⋮ A classified bibliography of recent research relating to project risk management ⋮ Adjustment of the moments of the project completion times when activity times are exponentially distributed ⋮ The value of side information in network flow optimization ⋮ Evaluating project completion times when activity times are Weibull distributed ⋮ Resource-constrained project scheduling: Notation, classification, models, and methods ⋮ Unnamed Item ⋮ The bias of an estimate of coupled slack in stochastic PERT networks ⋮ An upper bound on the expected completion time of PERT networks ⋮ Estimating the mean completion time of PERT networks with exponentially distributed durations of activities ⋮ Stochastic activity networks with truncated exponential activity times
This page was built for publication: Inequalities for the Completion Times of Stochastic PERT Networks