Sequencing with Series-Parallel Precedence Constraints
DOI10.1287/moor.4.3.215zbMath0437.90047OpenAlexW2170113998MaRDI QIDQ3879034
Clyde l. Monma, Jeffrey B. Sidney
Publication date: 1979
Published in: Mathematics of Operations Research (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/ecc879ebccfa021685c566be442635736430825f
schedulingsequencingseries-parallel precedence constraintsone-machine total weighted completion time problemleast cost fault detection problemmaximum cumulative cost problemadjacent pairwise job interchangeefficient general algorithmsubsequences of jobstotal preference orderingtwo-machine maximum completion time flow-shop problem
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Related Items (41)
This page was built for publication: Sequencing with Series-Parallel Precedence Constraints