Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Sequencing with Series-Parallel Precedence Constraints - MaRDI portal

Sequencing with Series-Parallel Precedence Constraints

From MaRDI portal
Publication:3879034

DOI10.1287/moor.4.3.215zbMath0437.90047OpenAlexW2170113998MaRDI QIDQ3879034

Clyde l. Monma, Jeffrey B. Sidney

Publication date: 1979

Published in: Mathematics of Operations Research (Search for Journal in Brave)

Full work available at URL: https://semanticscholar.org/paper/ecc879ebccfa021685c566be442635736430825f




Related Items (41)

Optimal ordering of statistically dependent testsA compact labelling scheme for series-parallel graphsA survey on how the structure of precedence constraints may change the complexity class of scheduling problemsSequential testing of complex systems: a reviewThe two-machine flow shop problem with arbitrary precedence relationsThe three-machine flow-shop problem with arbitrary precedence relationsStochastic scheduling and forwards inductionComplexity and approximation of open shop scheduling to minimize the makespan: a review of models and approachesExact and Approximation Algorithms for the Expanding Search Problem`Strong'-`weak' precedence in scheduling: extensions to series-parallel ordersScheduling problems with partially ordered jobsSearch and rescue in the face of uncertain threatsScheduling modular projects on a bottleneck resourceConfluence up to GarbageScheduling series-parallel task graphs to minimize peak memorySequencing with general precedence constraintsOn Submodular Search and Machine SchedulingSingle machine scheduling with a generalized job-dependent cumulative effectVyacheslav Tanaev: contributions to scheduling and related areasSolutions for subset sum problems with special digraph constraintsScheduling results applicable to decision-theoretic troubleshootingApproximation algorithms for single-machine sequencing with delivery times and unit batch set-up timesA note on the optimality of index priority rules for search and sequencing problemsTime-critical testing and search problemsA two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentationsSequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methodsA branch‐and‐bound algorithm for scheduling of new product development projectsSingle machine scheduling with precedence constraints and positionally dependent processing timesMinimizing the makespan in a two-machine cross-docking flow shop problemOptimal ordering of independent tests with precedence constraintsOn strictly optimal schedules for the cumulative cost-optimal scheduling problemDiscrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent resultsConfluence up to garbage in graph transformationA review of four decades of time-dependent scheduling: main results, new topics, and open problemsA decomposition theory based on a dominance relation and composite jobsOn nonpreemptive strategies in stochastic schedulingA Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and RepairEffective optimization methods for single-machine scheduling (survey)Miscellaneous Digraph ClassesScheduling Opposing ForestsNon-bottleneck machines in three-machine flow shops




This page was built for publication: Sequencing with Series-Parallel Precedence Constraints