Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study - MaRDI portal

Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study

From MaRDI portal
Publication:3882171

DOI10.2307/2581688zbMath0439.90042OpenAlexW4232345984MaRDI QIDQ3882171

Slowinski, Roman

Publication date: 1980

Published in: The Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.2307/2581688




Related Items (37)

A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizingA local constraint based analysis approach to project scheduling under general resource constraintsMultimode time-cost-robustness trade-off project scheduling problem under uncertaintyAn exact algorithm for project scheduling with multiple modesControllable processing times in project and production management: analysing the trade-off between processing times and the amount of resourcesScheduling unit-time tasks in renewable resource constrained flowshopsThe impact of a limited budget on the corrective action taking processProject scheduling with finite or infinite number of activity processing modes -- a surveyMIP heuristics for a resource constrained project scheduling problem with workload stability constraintsMulti-mode resource-constrained project scheduling using RCPSP and SAT solversResource-constrained project scheduling: A survey of recent developments.Multiobjective network scheduling with efficient use of renewable and nonrenewable resourcesThe preemptive stochastic resource-constrained project scheduling problemModels and matheuristics for the unrelated parallel machine scheduling problem with additional resourcesPreemptive scheduling with staircase and piecewise linear resource availabilityBetter permutations for the single-processor scheduling with time restrictionsMulti-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policiesAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesPre-emption in resource-constrained project schedulingStochastic scheduling to minimize expected maximum latenessKapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)Some efficient multi-heuristic procedures for resource-constrained project schedulingComputational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problemsA hybrid scatter search for the discrete time/resource trade-off problem in project schedulingAn efficient optimal solution procedure for the preemptive resource-constrained project scheduling problemA new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modesScheduling projects with limited number of preemptionsPSPLIB -- a project scheduling problem libraryA genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problemAn innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrainsA multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problemPreemptive scheduling of independent jobs on parallel machines subject to financial constraintsScheduling subject to resource constraints: Classification and complexityMathematical programming formulations for machine scheduling: A surveyParallel machine scheduling with additional resources: notation, classification, models and solution methodsA heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stagesSolving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms







This page was built for publication: Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study