Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article - MaRDI portal

scientific article

From MaRDI portal
Publication:3883869

zbMath0441.90039MaRDI QIDQ3883869

Ghanshiam Das, Parkash Lal Maggu

Publication date: 1980


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items

An improved two-machine flowshop scheduling with intermediate transportationMachine scheduling with job delivery coordinationOn a scheduling problem in a robotized analytical systemApproximation algorithms for two-machine open shop scheduling with batch and delivery coordinationComplexity of problem \(TF2|v=1,c=2|C_{\max}\)Flowshop scheduling with interstage job transportationAn improved approximation algorithm for single machine scheduling with job deliveryCoordinating multi-location production and customer deliveryFlow shop scheduling problems with transportation constraints revisitedRealistic two-stage flowshop batch scheduling problems with transportation capacity and timesFlow shop scheduling problems with transportation constraints revisitedUET flow shop scheduling with delaysA two-machine flowshop scheduling problem with a separated maintenance constraintHybrid flowshop scheduling with interstage job transportationFlowshop problem \(F2 \to D|v=1\), \(c\geq 1|C_{\max}\) revisitedSingle machine scheduling with release dates and job delivery to minimize the makespanAnalysis of heuristics for the UET two-machine flow shop problem with time delaysMachine scheduling with deliveries to multiple customer locationsTwo-stage scheduling on identical machines with assignable delivery times to minimize the maximum delivery completion timeOptimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing timesTransporting jobs through a two‐machine open shopTwo-machine flowshop group scheduling problemPreemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion timeUnrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness