ON N-JOB, 2-MACHINE FLOW-SHOP SCHEDULING PROBLEM WITH ARBITRARY TIME LAGS AND TRANSPORTATION TIMES OF JOBS
From MaRDI portal
Publication:3958260
DOI10.15807/JORSJ.25.219zbMath0494.90042OpenAlexW415256648MaRDI QIDQ3958260
Parkash Lal Maggu, Noor Mohammad, Sri Krishan Yadav, Manohar Lal Singhal
Publication date: 1982
Published in: Journal of the Operations Research Society of Japan (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.15807/jorsj.25.219
solution algorithmoptimal sequencetransportation times of jobsarbitrary time lagsminimal total elapsed timen- job 2-machine flow-shop scheduling problem
This page was built for publication: ON N-JOB, 2-MACHINE FLOW-SHOP SCHEDULING PROBLEM WITH ARBITRARY TIME LAGS AND TRANSPORTATION TIMES OF JOBS