Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System

From MaRDI portal
Publication:3983494

DOI10.1057/jors.1991.148zbMath0742.90036OpenAlexW2014596332MaRDI QIDQ3983494

No author found.

Publication date: 27 June 1992

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.1991.148




Related Items (23)

A common cycle approach for solving the economic lot and inspection scheduling problemThe impact of a free-repair warranty policy on EMQ model for imperfect production systemsInspection scheduling for imperfect production processes under free repair warranty contractJoint optimization of condition-based maintenance and production lot-sizingSustainable inventory management with hybrid production system and investment to reduce defectsModeling an inventory problem with random supply, inspection and machine breakdownJoint determination of optimal safety stocks and production policy for an imperfect production systemSimultaneous determination of production and maintenance schedules using in‐line equipment condition and yield informationEffect of warranty and quantity discounts on a deteriorating production system with a Markovian production process and allowable shortagesOptimal production run length for products sold with warranty in an imperfect production system with allowable shortagesInventory models for defective items incorporating marketing decisions with variable production costInventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investmentIntegrated production-inventory models with imperfect production processes and a limited capacity for raw materialsJoint determination of production run length and number of standbys in a deteriorating production processSimultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production systemImpact of inspection errors on the lot size problemA production: inventory model for defective items with shortages incorporating inflation and time value of moneyECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIMEOptimal production run time for a deteriorating production system under an extended inspection policyCapital investment in setup cost reduction for a lot-size, reorder point modelCombined production-maintenance decisions in situations with process deteriorationDetermining the optimal production--maintenance policy with inspection errors: Using a Markov chainAn optimal production run time with imperfect production processes and allowable shortages






This page was built for publication: Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System