Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System
From MaRDI portal
Publication:3983494
DOI10.1057/jors.1991.148zbMath0742.90036OpenAlexW2014596332MaRDI QIDQ3983494
No author found.
Publication date: 27 June 1992
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1991.148
Related Items (23)
A common cycle approach for solving the economic lot and inspection scheduling problem ⋮ The impact of a free-repair warranty policy on EMQ model for imperfect production systems ⋮ Inspection scheduling for imperfect production processes under free repair warranty contract ⋮ Joint optimization of condition-based maintenance and production lot-sizing ⋮ Sustainable inventory management with hybrid production system and investment to reduce defects ⋮ Modeling an inventory problem with random supply, inspection and machine breakdown ⋮ Joint determination of optimal safety stocks and production policy for an imperfect production system ⋮ Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information ⋮ Effect of warranty and quantity discounts on a deteriorating production system with a Markovian production process and allowable shortages ⋮ Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages ⋮ Inventory models for defective items incorporating marketing decisions with variable production cost ⋮ Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment ⋮ Integrated production-inventory models with imperfect production processes and a limited capacity for raw materials ⋮ Joint determination of production run length and number of standbys in a deteriorating production process ⋮ Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system ⋮ Impact of inspection errors on the lot size problem ⋮ A production: inventory model for defective items with shortages incorporating inflation and time value of money ⋮ ECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIME ⋮ Optimal production run time for a deteriorating production system under an extended inspection policy ⋮ Capital investment in setup cost reduction for a lot-size, reorder point model ⋮ Combined production-maintenance decisions in situations with process deterioration ⋮ Determining the optimal production--maintenance policy with inspection errors: Using a Markov chain ⋮ An optimal production run time with imperfect production processes and allowable shortages
This page was built for publication: Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System